A concrete footing calculator works out how much concrete a footing pour needs, in the two units that matter: cubic yards for a ready-mix order, and bags for a smaller mixed-by-hand job. Footings come in a few shapes, and each is measured differently, which is where a single volume formula falls short and a shape-aware calculator earns its place.

This calculator covers the three footings most projects use: continuous strip footings under walls, isolated pad footings under posts and columns, and round pier or sonotube footings for decks and porches. Pick the type, enter the dimensions, and it returns the cubic yards, the bag count for your chosen bag size, and an optional cost, with a waste allowance for over-excavation and spillage. It estimates material only; footing size, depth, and reinforcement are set by your local code, not by this tool.

$
Waste Factor10%
Concrete Needed
Concrete Volume
0.72 cu yd
19.6 cu ft · 10% waste included
Bagged Concrete
33 bags
80 lb bags
Material estimate only, not structural approval. Footing size, depth below the frost line, soil bearing, and reinforcement must follow your local building code or an engineer. Order a little extra so you never run short mid-pour. Above about 1 cubic yard, ready-mix usually beats bags.

A concrete footing calculator works out how much concrete a footing pour needs, in the two units that matter: cubic yards for a ready-mix order, and bags for a smaller mixed-by-hand job. Footings come in a few shapes, and each is measured differently, which is where a single volume formula falls short and a shape-aware calculator earns its place.

This calculator covers the three footings most projects use: continuous strip footings under walls, isolated pad footings under posts and columns, and round pier or sonotube footings for decks and porches. Pick the type, enter the dimensions, and it returns the cubic yards, the bag count for your chosen bag size, and an optional cost, with a waste allowance for over-excavation and spillage. It estimates material only; footing size, depth, and reinforcement are set by your local code, not by this tool.

Step-by-Step

How to Use This Calculator

Step 1: Choose the footing type

Select Strip for a continuous footing under a wall, Pad for isolated rectangular pads under posts or columns, or Pier for round holes and sonotube footings under decks and porches. The inputs and the diagram change to match.

Step 2: Enter the dimensions

For strip and pad, enter length, width, and thickness, each with its own unit (length is usually in feet, width and thickness in inches). For pads, add the number of pads. For piers, enter the diameter, the depth, and the number of piers. Use the actual concrete dimensions, not the hole size if you are over-digging.

Step 3: Pick the bag size (advanced)

The default is the 80 pound bag, the most common for footings. Switch to 60 or 40 pound in the advanced section if that is what you are buying, and the bag count updates.

Step 4: Set the waste factor (advanced)

Keep 10 percent for typical trench and pour conditions. Raise it for rough excavation, soft or uneven trench bottoms, or hand-dug holes that are wider than planned, all of which swallow extra concrete.

Step 5: Add cost (optional)

Enter a price per cubic yard for ready-mix (commonly around $120 to $200 per yard) or per bag, and pick the matching basis. The calculator applies it to the right quantity.

Reading the results

Concrete Volume in cubic yards is your ready-mix order; the bag count is for mixing by hand. If the bag count climbs past about 45 (one yard), ready-mix is usually the better buy. Always order a little extra, since running short mid-pour creates a cold joint. Use the copy button to save the figures.

The Formula

How the Calculation Works

Every footing estimate is a volume calculation: work out the cubic feet of the footing, add waste, then convert to cubic yards and bags. Only the volume step changes with the shape.

Strip and pad footings (rectangular)

Volume = Length × Width × Thickness

All three in feet. A strip footing is one continuous run (quantity 1); a pad footing multiplies by the number of identical pads. A 20 foot strip footing 16 inches wide and 8 inches thick is 20 × 1.333 × 0.667 = about 17.8 cubic feet.

Pier and sonotube footings (cylindrical)

Volume = π × (Diameter / 2)² × Depth × Quantity

A round pier is a cylinder. Six 12 inch piers each 42 inches deep: π × 0.5² × 3.5 × 6 = about 16.5 cubic feet.

Add waste

Order volume = Volume × (1 + waste)

The default 10 percent covers over-excavation, uneven trench bottoms, and spillage. 17.8 × 1.10 = about 19.6 cubic feet.

Convert to cubic yards

Cubic yards = Order volume / 27

There are 27 cubic feet in a cubic yard, the unit ready-mix is sold in. 19.6 / 27 = 0.72 cubic yards.

Convert to bags

Bags = round up (Order volume / bag yield)

An 80 pound bag yields about 0.60 cubic feet, a 60 pound bag about 0.45, and a 40 pound bag about 0.30. At 0.60: 19.6 / 0.60 = about 33 bags. As a shortcut, one cubic yard takes about 45 bags of 80 lb, 60 bags of 60 lb, or 90 bags of 40 lb.

Cost (optional): Cost = cubic yards × price per yard, or bags × price per bag, matching how you are buying.

Real Example

Worked Example

Scenario: A continuous strip footing for a garage

You are pouring a strip footing around a detached garage with a total run of 40 feet, 18 inches wide and 10 inches thick, using a 10 percent waste allowance, and pricing ready-mix at $160 per cubic yard.

Step 1: Volume in cubic feet

Convert width and thickness to feet: 18 inches = 1.5 feet, 10 inches = 0.833 feet.

40 × 1.5 × 0.833 = 50 cubic feet

Step 2: Add 10% waste

50 × 1.10 = 55 cubic feet

Step 3: Convert to cubic yards

55 / 27 = 2.04 cubic yards

Step 4: Bag equivalent

55 / 0.60 = 91.7, rounded up to 92 bags of 80 pound mix

Step 5: Cost

2.04 × $160 = about $326 in ready-mix

Final estimate: About 2.04 cubic yards, roughly $326 delivered. The bag equivalent, 92 bags, is the tell that this is a ready-mix job: mixing 92 bags by hand would take many hours and risk inconsistent concrete, and at typical bag prices it would also cost more than the $326 ready-mix. For a small job like a handful of deck piers the bag count would be low enough to mix yourself, but a continuous garage footing belongs on a truck. Remember this figure is concrete only; the footing’s width, thickness, depth below frost, and rebar come from your local code.

Inputs Explained

Understanding the Variables

Footing Type

Selects the geometry. Strip is a continuous footing under a wall, measured as one long run. Pad is an isolated rectangular footing under a point load (a post or column), measured per pad and multiplied by the count. Pier is a round, vertical footing (often poured in a sonotube) for decks, porches, and posts, measured as a cylinder.

Length, Width, and Thickness (strip and pad)

The three dimensions of a rectangular footing. Length is the run (the full perimeter length for a strip footing); width is the footing’s face width; thickness is how deep the concrete itself is, not how far below grade the trench sits. Each has its own unit, since length is usually in feet while width and thickness are in inches.

Number of Pads (pad type)

How many identical pad footings you are pouring. The calculator multiplies one pad’s volume by this count. For pads of different sizes, run each size separately and add the results.

Diameter, Depth, and Number of Piers (pier type)

The diameter of the round footing or tube, the depth (full height of concrete in the hole or tube), and how many you are pouring. Pier volume grows with the square of the diameter, so a small increase in diameter adds noticeably more concrete. If your tube form has a flared or belled base, add that volume separately from the manufacturer’s spec sheet.

Bag Size (advanced)

The mix bag you plan to buy, which sets the bag count. Standard estimating yields are about 0.60 cubic feet for an 80 pound bag, 0.45 for a 60 pound bag, and 0.30 for a 40 pound bag, so it takes roughly 45, 60, or 90 bags respectively to make one cubic yard. Yields vary slightly by brand, so check the bag.

Waste Factor (advanced)

The allowance for over-excavation, uneven trench bottoms, spillage, and ordering safety. Ten percent is a sound default for footings; raise it for rough or hand-dug excavation where the actual hole ends up larger than planned. Footings are unforgiving of a short pour, so erring high is wise.

Concrete Cost

An optional price, entered per cubic yard for ready-mix or per bag for bagged mix, with a matching basis selector. As rough ranges, ready-mix commonly runs about $120 to $200 per cubic yard, and an 80 pound bag a few dollars each. Affects only the cost output.

Verified Specs

Industry Standards & References

IRC Section R403 (Footings)

The International Residential Code sets the baseline for residential footings: minimum widths and thicknesses by load and soil, the requirement that footings bear on undisturbed or compacted soil, and the rule that they extend below the frost line. Building departments check footing work against R403, and footing sizing tables in the code are tied to presumptive soil bearing values.

Frost depth

Footings must sit below the local frost line so that freezing and thawing soil cannot heave them. Frost depth ranges from essentially zero in the far south to 48 inches or more in northern states; in frost-free areas a minimum of 12 inches below grade is typical. This depth governs how deep the hole is, separate from how thick the concrete footing itself is.

Soil bearing capacity

How wide a footing must be depends on the load above and the soil’s presumptive load-bearing value (for example, the code assigns lower values to soft clays than to gravel or sandy gravel). A footing spreads the structure’s load over enough soil area to stay within that value, which is why footing width is an engineering decision, not a rule of thumb.

ACI 318 and ACI 332

ACI 318 is the structural concrete code governing footing design and reinforcement; ACI 332 covers residential concrete specifically. These standards (and local code) determine rebar size, placement, and concrete strength, none of which a volume estimate addresses.

Concrete strength (PSI)

Footings are typically specified at a minimum compressive strength in the range of 2,500 to 3,000 psi for residential work, higher where the concrete is exposed to freeze-thaw or de-icing salts. Your mix or ready-mix order should state the required strength for the application.

Call 811 before digging: as with any excavation, contact the 811 one-call service to locate buried utilities before digging footing trenches or pier holes. It is free and required in most jurisdictions, and it prevents dangerous, costly strikes on gas and electric lines.